Refurbishing Aubrey Allen Freezer Floor With Our Highly Effective Polyurethane Screed With Anti-Slip Additive For Improved Worker Safety In 3 Days
By Advanced Resin on Jun 9, 2026 3:24:21 PM

Location: Coventry
Project Size: Approx 25 sqm2
Project Specification: Polyurethane screed
- Remove all failed screed areas in blast chillers and freezer
- prepare substrate via vacuum-enclosed diamond grinding to remove all surface contamination and leave a clean textured mechanical finish
- Saw cut anchor points to all perimeters of areas and apply fibre reinforcing mesh to areas
- Apply nominal 9mm polyurethane screed to all areas
- Apply polyurethane cove to all wall details
- Recut and bring through each concrete joint and apply polyurethane jointing compound
- Apply polyurethane coating to the packaging area incorporating anti-slip additive
- Project completed in 3 days
- case studies (79)
- News (39)
- Epoxy Flooring (33)
- Commercial Resin Flooring (31)
- Industrial Resin Flooring (19)
- Commerical flooring (13)
- Resin Driveways (10)
- industrial flooring (9)
- Polyurethane (8)
- Food Industry (6)
- Polyurethane Flooring (6)
- Polyurethane Screeds (5)
- MMA Flooring (4)
- Commercial Flooring (3)
- Industrial (3)
- Interior (2)
- Resin Flooring (2)
- Anti-Static Flooring (1)
- Anti-slip (1)
- Car Park Flooring (1)
- Gym Changing Rooms (1)
- Retail flooring (1)
- Screed (1)
- Underfloor Heating (1)
- Work (1)
- resin bonded driveway (1)
- resin bound driveway (1)
- June 2026 (67)
- May 2026 (3)
- April 2026 (2)
- March 2026 (2)
- January 2026 (1)
- December 2025 (2)
- November 2025 (2)
- October 2025 (2)
- September 2025 (2)
- July 2025 (3)
- June 2025 (3)
- May 2025 (4)
- April 2025 (4)
- March 2025 (1)
- February 2025 (2)
- November 2024 (2)
- October 2024 (1)
- September 2024 (2)
- August 2024 (2)
- July 2024 (2)
- June 2024 (2)
- May 2024 (2)
- April 2024 (2)
- March 2024 (2)
- February 2024 (2)
- January 2024 (2)
- December 2023 (2)
- November 2023 (2)
- October 2023 (2)
- September 2023 (2)
- August 2023 (2)
- July 2023 (2)
- June 2023 (2)
- May 2023 (2)
- January 2021 (1)
- December 2020 (7)
- November 2020 (1)
- August 2020 (2)
- June 2020 (1)
- May 2020 (1)
- March 2020 (1)
Subscribe by email
Share this
You May Also Like
These Related Stories
Removing Surface Contamination & Applying Oil Tolerant And Our Trusted Durable Epoxy Coatings In Chosen RAL With Added Demarcations For Autoinspire Ltd

Removing Surface Contamination & Applying Oil Tolerant And Our Trusted Durable Epoxy Coatings In Chosen RAL With Added Demarcations For Autoinspire Ltd
Jun 9, 2026 3:18:41 PM
1
min read
Applying Our Trusted Polyurethane Screed Combined With Jointing Compound & PAS Demarcations For Added Worker Safety In 7 Days

Applying Our Trusted Polyurethane Screed Combined With Jointing Compound & PAS Demarcations For Added Worker Safety In 7 Days
Jun 9, 2026 3:04:22 PM
1
min read
Repairing & Replacing Failed Coating In MOT Station Stoke With Our Trusted And Durable Epoxy Flake System & UV Stable Polyaspartic Demarcations For Safety
.webp)
Repairing & Replacing Failed Coating In MOT Station Stoke With Our Trusted And Durable Epoxy Flake System & UV Stable Polyaspartic Demarcations For Safety
Jun 9, 2026 10:35:27 AM
1
min read


.webp?width=708&height=151&name=request-your-free-quote-today-new%20(1).webp)
No Comments Yet
Let us know what you think