locations: Nottingham

overall size of the project: approx. 240m2

system: polyurethane system with coving and expansion joints

  • New pet food production areas.
  • Degreased and diamond ground to prepare the substrate.
  • Epoxy pumaprime DPM was applied and broadcast with quartz aggregate.
  • 6mm pumadur HF polyurethane screed applied.
  • 100mm high x 50mm radius cove detail with birds beak trim.
  • Completed in 1 week.