Case Study | Providing High-quality Polyurethane screed After New Drains

Written by Advanced Resin | Jun 8, 2026 9:36:04 AM

 

Location: Conway Wales

Project Size: Approx 250sqm2

Project Specification: Polyurethane screed

  • prepare substrate via vacuum-enclosed diamond grinding
  • Cut and remove all areas of concrete for installation of new Stainless Steel Drains
  • Once installed fill with high tensile strength concrete anchored to the original concrete slab
  • Apply DPM primer and anchor cuts to all perimeters and transitions
  • Apply 9mm polyurethane screed in chosen Ral
  • Apply Polyurethane coving materials to all wall/kerb details
  • Apply polyurethane jointing compound to all joints and transitions
  • The project was completed in 7 days