Removing Surface Contamination For IPL Sittingbourne & Completing 8,000 sqm2 Polyurethane Screed in 25 Days
By Advanced Resin on Jun 9, 2026 11:04:22 AM
.webp)
locations: Sittingbourne
overall size of the project: Approx 8,000 sqm2
specification: Polyurethane screed
- Prepare substrate via vacuum-enclosed shot-blasting to remove all surface contamination and leave a clean textured mechanical finish.
- Apply Moisture Tolerant Primer to the entire area and blind with quartz aggregates.
- Saw-cut anchor points to all perimeters of each individual concrete slab and the entire building area.
- Apply nominal 9mm polyurethane screed to all areas.
- Recut and bring through each concrete joint and apply polyurethane jointing compound.
- The project was completed in 25 days.
- case studies (79)
- News (39)
- Epoxy Flooring (33)
- Commercial Resin Flooring (31)
- Industrial Resin Flooring (19)
- Commerical flooring (13)
- Resin Driveways (10)
- industrial flooring (9)
- Polyurethane (8)
- Food Industry (6)
- Polyurethane Flooring (6)
- Polyurethane Screeds (5)
- MMA Flooring (4)
- Commercial Flooring (3)
- Industrial (3)
- Interior (2)
- Resin Flooring (2)
- Anti-Static Flooring (1)
- Anti-slip (1)
- Car Park Flooring (1)
- Gym Changing Rooms (1)
- Retail flooring (1)
- Screed (1)
- Underfloor Heating (1)
- Work (1)
- resin bonded driveway (1)
- resin bound driveway (1)
- June 2026 (67)
- May 2026 (3)
- April 2026 (2)
- March 2026 (2)
- January 2026 (1)
- December 2025 (2)
- November 2025 (2)
- October 2025 (2)
- September 2025 (2)
- July 2025 (3)
- June 2025 (3)
- May 2025 (4)
- April 2025 (4)
- March 2025 (1)
- February 2025 (2)
- November 2024 (2)
- October 2024 (1)
- September 2024 (2)
- August 2024 (2)
- July 2024 (2)
- June 2024 (2)
- May 2024 (2)
- April 2024 (2)
- March 2024 (2)
- February 2024 (2)
- January 2024 (2)
- December 2023 (2)
- November 2023 (2)
- October 2023 (2)
- September 2023 (2)
- August 2023 (2)
- July 2023 (2)
- June 2023 (2)
- May 2023 (2)
- January 2021 (1)
- December 2020 (7)
- November 2020 (1)
- August 2020 (2)
- June 2020 (1)
- May 2020 (1)
- March 2020 (1)
Subscribe by email
Share this
You May Also Like
These Related Stories
Removing Existing Failed Coating & Replacing It With Our Durable Polyurethane Screed In Just 3 Days For IPL LTD’s New Wash Room

Removing Existing Failed Coating & Replacing It With Our Durable Polyurethane Screed In Just 3 Days For IPL LTD’s New Wash Room
Jun 9, 2026 12:15:08 PM
1
min read
Supplying Repairs & Two Coats Of High Build Epoxy Resin In a 3000m2 Industrial Refurbishment Project In 7 Days

Supplying Repairs & Two Coats Of High Build Epoxy Resin In a 3000m2 Industrial Refurbishment Project In 7 Days
Jun 9, 2026 11:55:54 AM
1
min read
Removing Failed Flooring & Applying Our Durable Protective Polyurethan Screed In Chosen RAL In Just 2 Days For IPL LTD’s Forktuck Turning Isle

Removing Failed Flooring & Applying Our Durable Protective Polyurethan Screed In Chosen RAL In Just 2 Days For IPL LTD’s Forktuck Turning Isle
Jun 9, 2026 12:18:08 PM
1
min read



No Comments Yet
Let us know what you think